State Farm – Colorado Springs
Responded to a total loss structure fire requiring complete demolition and abatement.
Location
Colorado Springs, CO 80904
Date
March 24–29, 2025
Scope
Fire Demo & Full Gut Abatement
Project Summary
Responded to a total loss structure fire requiring complete demolition and abatement. Chrysotile asbestos detected (2–3%) in the second level and basement. Full containment and abatement procedures conducted. Demolition included second level, main floor, and basement—a total of 3,500 sq ft removed. Location: Colorado Springs, CO 80904 Date: March 24–29, 2025 Scope: Fire Demo & Full Gut Abatement
This case study was migrated from the current ACES website as part of the Atlas recovery effort so the new site preserves real project evidence instead of generic filler copy.