State Farm – Colorado Springs
Fire Demo & Full Gut Abatement
Responded to a total loss structure fire requiring complete demolition and abatement.
Read case studyCase Studies
These project summaries were migrated from the current ACES site because they show the kinds of technical, time-sensitive, and regulated scopes Atlas is already delivering.
Case Studies
Examples of fire-loss demolition, emergency water response, and pre-renovation abatement work completed across Colorado.

Fire Demo & Full Gut Abatement
Responded to a total loss structure fire requiring complete demolition and abatement.
Read case study
Water Loss Mitigation
A rapid response was carried out to address water damage in a leasing office.
Read case study
Water Loss & Asbestos Abatement
A pipe break on the second level resulted in significant water damage.
Read case study
Emergency Water Spill Response
Our team was deployed to address a major water spill that posed immediate health and safety risks.
Read case study
Pre-Demolition Asbestos Abatement
As part of a pre-demolition inspection, multiple building materials were found to contain ACM.
Read case study
Pre-Renovation Asbestos Abatement
Comprehensive abatement executed ahead of facility renovations.
Read case study
Pre-Renovation Asbestos Abatement
Prior to building renovation, multiple interior materials were tested and confirmed ACM-positive.
Read case study
Pre-Renovation Asbestos Abatement
Asbestos-containing materials identified in various interior finishes ahead of renovation.
Read case studyAtlas can review the scope, explain the hazard controls, and show you what the project needs before the next trade can move in.